Project Location
The 2005/2006 phases of the Sewer System Rehab
Program will be concentrated in four basins Peachtree Creek (PTC), Proctor
Creek (PRC), Utoy Creek (UTC), and South River (SRV). Please refer to
attached maps for more detailed information regarding location. Every
quadrant of the City will be affected by the Sewer System Rehab work.
Implementation Plan:
The Sewer System Rehabilitation Program will be
implemented through the use 5 contracts. The annual contracts will
be referenced as Small Diameter Sewer Rehab Contract (SDRC), Sewer
Group 1 Rehab Contracts A, B, C and D. Sewer Group 1 represents the
sewers that are considered to be in the highest priority for rehab
based on historical and maintenance records; however, the rehab program
will not be confined to the Sewer Group 1 sewersheds.
For the SG 1 Rehab Contracts, the sewersheds will be assigned by basin:
Contract A will be assigned to the Peachtree Creek basin, Contract B
will be assigned to the South River basin, Contract C will be assigned
to the Utoy Creek basin and Contract D will be assigned to the Proctor
Creek basin. Once a sewershed is released to the contractor, the full
scope of work will begin as determined by the contractor, but under
the direction of the Project Manager. SDRC work will be assigned as
needed in limited capacity areas as well as SG 1 sewersheds.
Potential Impacts:
Community impacts associated with the project include
disruption of service, partial/temporary road closure, work on private
property, excavation and noise.
|